Discover our diverse portfolio of energy, council, and commercial projects, showcasing our expertise in delivering high-quality infrastructure solutions.
Our team was the trusted contractor for the installation of new transformer pads and precast firewall upgrades at the Wairakei substation.
Amid challenging ground conditions and a tight timeframe, our teams safely excavated to depths of 5 meters to stabilize the ground before installing a 500mm thick foundation pad and concrete block retaining walls, all while working around existing structures.
This project was delivered as part of the Karaka development to provide a safe crossing for locals.
We were entrusted by a local power company to carefully expose existing high-voltage cables encased in concrete while working under live traffic conditions.
This project included the construction of three speed tables, over 300 meters of concrete footpath, and enhancements to the drainage system.
We were engaged by the Ministry of Education for a design and build project at Stanhope Road School, where we constructed a concrete car park and upgraded the drainage system. Our team worked closely with the Ministry to ensure the project met all specifications and enhanced the functionality of the school’s facilities
Our team successfully completed 800 meters of road widening with signalized intersections, overcoming soft ground conditions and nearly one meter of pavement construction.
We partnered with a local power company to safely demolish a decommissioned transition station and transform the site into a hardstand parking area.
Following the delivery of our client’s new brake press, the WMConstruction team was contracted to install a highly precise and complex foundation pad, complete with sumps and embedded plates.
We were tasked with delivering raised crossings, roundabout construction with new surfacing and drainage upgrades as part of a local school development in Karaka.
In response to noise concerns from local residents, our team was tasked with completing civil works and installing container walls to minimize noise pollution at a power generation site.
Construction of the accessway for James St Carpark
As part of a local development project, our team constructed a speed table, upgraded drainage systems, and applied new line markings.
As part of the larger project, our team was selected to handle the civil works, ensuring timely progress and minimal disruption to the local community.
We completed an additional 400 meters of footpath for the local council, which included drainage upgrades and bus stop installations.
As part of a slip remediation project, our crews successfully managed extensive earthworks and constructed 2.5 meter high retaining walls in challenging ground conditions.
Our team succesffuly handled the investigation, design, and construction of precast concrete lids for high-voltage lines servicing the North Shore.
Our team delivered over 20 asphalt speed tables over various sites between Ahipara and Moerewa.
Our team installed over 200 signs & line marking around Whangarei as part of a project for the local council.
As part of a new tenancy, our client enlisted us to design and construct a 1,600m² concrete container wash bay capable of withstanding high impact loads.
Our crew in Whangarei upgraded the existing asphalt surface at a Housing New Zealand site to enhance its overall appearance.
Our maintenance crews successfully reconstructed the pavement for this warehouse. With support from trusted subcontractors, we milled the existing surface for recycling and installed a high-fatigue asphalt surface.
We were proud to collaborate closely with engineering firms to deliver this external emergency staircase. This project included a 2-meter deep foundation alongside existing structures and the installation of structural steelworks for the staircase.
Working night shifts in an active shopping mall environment, our teams excavated and installed new foundation pads for seismic strengthening at New Zealand's oldest mall.
Our team completed the hardscaping works, which included rock face retaining walls, drainage improvements, concrete parking areas, and landscaping upgrades.
We collaborated closely with the local council to ensure the safe delivery of this project, given the high-traffic nature of the area.
Our crews were proud to deliver drainage upgrades along the front of the iconic boat sheds in Orakei.
This is one of many driveways our trusted teams have built for residents of the north island, upgrading their deteriorating driveway to a stunning concrete finish.
Whether for residential or commercial properties, our teams have the experience and expertise to provide a variety of asphalt repair solutions.
Property Manager
© 2024 WMConstruction. All rights reserved.